Approximate date of another remodeling of the top floor
bathroom. The ceiling was lowered about two feet. Drywall was added to the
existing walls in the bathroom, further closing in the room. A shower in the
middle of the tiny room replaced the bathtub. A new tile floor was added (2x2”
cream colored tiles) and the new bathroom is painted peach.
No comments:
Post a Comment