Tuesday, March 26, 2013

Remodeling Circa 1980



Approximate date of another remodeling of the top floor bathroom. The ceiling was lowered about two feet. Drywall was added to the existing walls in the bathroom, further closing in the room. A shower in the middle of the tiny room replaced the bathtub. A new tile floor was added (2x2” cream colored tiles) and the new bathroom is painted peach.

No comments:

Post a Comment